The document this clause was read from is superseded. It is kept so older citations resolve.

Responsible land use

Concrete Sustainability Council·clause E2.02·p.68

The requirement

CSC Technical Manual clause E2.02 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Evidence required
Concrete: Site layout showing the locations of the main plant installations including roadways, stormwater drains, retention basins, etc. The layout plan includes an explanation as to why/how the site layout enables using the land in a particularly efficient way (e.g. biodiversity, efficient traffic flow, stormwater management, efficient storage / processing of materials). Cement / Aggregates: A quarry development plan is in place which includes the extraction plan and reclamation plan. AND Evidence that progressive reclamation is pursued where reasonably practical and permitted under local requirements.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Screen — a check against a list or a criterion before anything else applies
Standing
Required — must be met for the credential
Impact area
Ecosystem Health — the CMF area the clause addresses

Cite this clause

Concrete Sustainability Council · CSC Technical Manual · version v2.1 · clause E2.02 · page 68 · build 2026-10-05-0439 · https://klarcite.com/r/ded0858b704df858

Source document

Record details

Page 68, E2 - Land Use. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid ded0858b704df858 · document 1a9857eb57c8253e · published 2021-11-22

Other clauses in this standard