Effective procedure for accurate and timely payment
Responsible Steel·clause 6.8.2·p.62
The requirement
The publisher’s words are shown on request, below the limits.
The publisher’s words
The publisher lets each reader see 20 of this document’s clauses a day when signed in, or 5 without signing in.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Social Health & Equity — the CMF area the clause addresses
Cite this clause
Responsible Steel · ResponsibleSteel International Production Standard · version 2.1.1 · clause 6.8.2 · page 62 · build 2026-10-05-0439 · https://klarcite.com/r/dce99f00bf2a4c2c
Record details
Page 62, Criterion 6.8: Remuneration. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid dce99f00bf2a4c2c · document 8ad064b7950dbeda · fidelity verbatim · published 2024-10