Water use information provision
GECA·clause EV-5.2·p.34
The requirement
The publisher’s words are shown on request, below the limits.
The publisher’s words
The publisher lets each reader see 4 of this document’s clauses a day.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
How it is proven
- Evidence required
- Information on water use and management during the manufacturing process.
- Who checks it
- Applicant declares — a signed statement from the applicant
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
- Impact area
- Ecosystem Health — the CMF area the clause addresses
Cite this clause
GECA · Building Insulation Materials · version BIM Gen 3.0 · clause EV-5.2 · page 34 · build 2026-10-05-0439 · https://klarcite.com/r/d4cbac1bd22c72bd
Record details
Page 34, EV-5.2 WATER. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid d4cbac1bd22c72bd · document 6a818ca4f3f10cf8 · fidelity verbatim · published 2026-06
Other clauses in this standard
| Clause | Name |
|---|---|
| EV-1.1 | Compliance with environmental legislation |
| EV-3.1.1 | Minimum recycled content requirements |
| EV-3.1.2 | Environmental remediation program for sand and rock |
| EV-3.1.2.3 | Raw material procurement program |
| EV-3.1.3 | No bleaching of cellulose fibre |
| EV-3.1.4 | Scoured wool requirements |