Environmental remediation program for sand and rock
GECA·clause EV-3.1.2·p.30
The requirement
The publisher’s words are shown on request, below the limits.
The publisher’s words
The publisher lets each reader see 4 of this document’s clauses a day.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
How it is proven
- Evidence required
- DoC EV-3.1.2.1: Records of the supplier, nature and geographical source of all non-recycled sand and rock; DoC EV-3.1.2.2: Evidence of a registered environmental remediation program.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Ecosystem Health — the CMF area the clause addresses
Cite this clause
GECA · Building Insulation Materials · version BIM Gen 3.0 · clause EV-3.1.2 · page 30 · build 2026-10-05-0439 · https://klarcite.com/r/afc9bc1e4148c012
Record details
Page 30, EV-3.1.2: SAND AND ROCK. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid afc9bc1e4148c012 · document 6a818ca4f3f10cf8 · fidelity verbatim · published 2026-06