Plan for waste diversion
GECA·clause EV-5.1·p.31
The requirement
The publisher’s words are shown on request, below the limits.
What the product must meet
Limits held for this clause
| Parameter / context | Operator | Limit | Unit |
|---|---|---|---|
| share | ≥ | 90 | % |
Compare this limit across schemes
The limit was held in the document’s own criteria field.
The publisher’s words
The publisher lets each reader see 3 of this document’s clauses a day.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
How it is proven
- Evidence required
- DoC EV-5.1.1: a copy of the WMP, that states the required diversion rate from landfill. DoC EV-5.1.2: evidence of systems in place to protect the quality of construction waste materials. DoC EV-5.1.3: evidence of the plan agreed upon with the waste recovery service provider.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Circular Economy — the CMF area the clause addresses
Cite this clause
GECA · Construction & Demolition Waste Services · version CDWS Gen 3.0 · clause EV-5.1 · page 31 · build 2026-10-05-0439 · https://klarcite.com/r/cf751d00b85899f8
Record details
Page 31, EV-5.1 PLANNING. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid cf751d00b85899f8 · document 64328b61121907c8 · fidelity verbatim · published 2026-06