The document this clause was read from is superseded. It is kept so older citations resolve.
Energy monitoring
BREEAM·clause Ene 02a·p.169
The requirement
BREEAM International New Construction Technical Manual clause Ene 02a — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- All Relevant section or clauses of the building specification or contract. Design drawings. BREEAM Assessor's site inspection report and photographic evidence.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
- Impact area
- Climate Health — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v6.0 · clause Ene 02a · page 169 · build 2026-10-05-0439 · https://klarcite.com/r/cc5eae081a377081
Record details
Page 169, BREEAM International New Construction. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid cc5eae081a377081 · document c79f01533227ee10 · fidelity verbatim · published 2016