Passive design measures for one credit
BREEAM·clause Ene 04 Passive design (up to 2 credits) - One credit·p.178
The requirement
BREEAM International New Construction Technical Manual clause Ene 04 Passive design (up to 2 credits) - One credit — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
Limits held for this clause
| Parameter / context | Operator | Limit | Unit |
|---|---|---|---|
| share | ≥ | 5 | % |
Compare this limit across schemes
The limit was read from the clause wording.
- Applies to
- (all buildings)
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Climate Health — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v6.0 · clause Ene 04 Passive design (up to 2 credits) - One credit · page 178 · build 2026-10-05-0439 · https://klarcite.com/r/ca80aaa0149f400c
Record details
Page 178, Ene 04 Low carbon design. Read in build 2026-10-05-0439, harvested 2026-10-05.