Sources of flooding and flood risk identification
BREEAM·clause M5·p.406
The requirement
BREEAM International New Construction Technical Manual clause M5 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Ecosystem Health — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause M5 · page 406 · build 2026-10-05-0439 · https://klarcite.com/r/c956bb5edc3aa5cc
Record details
Page 406, POL 03 FLOOD AND SURFACE WATER MANAGEMENT BREEAM NEW CONSTRUCTION. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid c956bb5edc3aa5cc · document e3e19e8b697bf44b · fidelity verbatim · published 2024