Life Cycle Cost and Service Life Planning
BREEAM·clause MAN-02·p.48
The requirement
BREEAM International New Construction Technical Manual clause MAN-02 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- Elemental LCC plan, confirmation from the design team as to how the LCC has influenced design/specification and drawings/specifications to support this.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause MAN-02 · page 48 · build 2026-10-05-0439 · https://klarcite.com/r/c4e49385a26a8a51
Record details
Page 48, MAN 02 LIFE CYCLE COST AND SERVICE LIFE PLANNING. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid c4e49385a26a8a51 · document e3e19e8b697bf44b · fidelity close quote · published 2024