Calculating energy generated by LZC technologies
BREEAM·clause M3.4·p.200
The requirement
BREEAM International New Construction Technical Manual clause M3.4 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Climate Health — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause M3.4 · page 200 · build 2026-10-05-0439 · https://klarcite.com/r/c2cae0742956426e
Record details
Page 200, Methodology. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid c2cae0742956426e · document e3e19e8b697bf44b · fidelity verbatim · published 2024