Developed Design stage material efficiency measures
BREEAM·clause 1c·p.320
The requirement
BREEAM International New Construction Technical Manual clause 1c — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
- Applies to
- (all buildings)
How it is proven
- Evidence required
- Report on deviations from previous stages. Documentation demonstrating the incorporation of the outcomes from the concept stage and additional actions, for example: design drawings or specifications demonstrating materials efficiency measures undertaken.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
- Impact area
- Circular Economy — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause 1c · page 320 · build 2026-10-05-0439 · https://klarcite.com/r/c2ad8ee4757ca7cb
Record details
Page 320, Methodology. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid c2ad8ee4757ca7cb · document e3e19e8b697bf44b · fidelity verbatim · published 2024