Calculations and confirmation from the appropriate consultant

BREEAM·clause Prerequisite 23·p.411

The requirement

BREEAM International New Construction Technical Manual clause Prerequisite 23 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

What the product must meet

Limits held for this clause

Parameter / contextOperatorLimitUnit
length≤5mm

Compare this limit across schemes

The limit was read from the clause wording.

How it is proven

Evidence required
Design drawings or relevant section or clauses of the building specification or contract indicating:
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Disclose — information the applicant must provide
Standing
Required — must be met for the credential

Cite this clause

BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause Prerequisite 23 · page 411 · build 2026-10-05-0439 · https://klarcite.com/r/b725933b9e0d2c72

Source document

Record details

Page 411, POL 03 FLOOD AND SURFACE WATER MANAGEMENT. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid b725933b9e0d2c72 · document e3e19e8b697bf44b · fidelity close quote · published 2024