Calculations and confirmation from the appropriate consultant
BREEAM·clause Prerequisite 23·p.411
The requirement
BREEAM International New Construction Technical Manual clause Prerequisite 23 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
Limits held for this clause
| Parameter / context | Operator | Limit | Unit |
|---|---|---|---|
| length | ≤ | 5 | mm |
Compare this limit across schemes
The limit was read from the clause wording.
How it is proven
- Evidence required
- Design drawings or relevant section or clauses of the building specification or contract indicating:
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause Prerequisite 23 · page 411 · build 2026-10-05-0439 · https://klarcite.com/r/b725933b9e0d2c72
Record details
Page 411, POL 03 FLOOD AND SURFACE WATER MANAGEMENT. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid b725933b9e0d2c72 · document e3e19e8b697bf44b · fidelity close quote · published 2024