No fossil fuels on-site
BREEAM·clause M6·p.183
The requirement
BREEAM International New Construction Technical Manual clause M6 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and located; only its shape defeated the harvest.
What the product must meet
- Exemptions
- — Industrial scale process loads. — Emergency and life safety systems such as those for firefighting, evacuation, or back-up power for safety-critical systems and equipment, or within healthcare settings. — Essential back-up systems serving buildings with functions where it is essential to maintain their continuous use, particularly in response to a disaster, for example hospitals, fire stations,
How it is proven
- Who checks it
- Applicant declares — a signed statement from the applicant
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Climate Health — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause M6 · page 183 · build 2026-10-05-0439 · https://klarcite.com/r/b60a2de454204bf9
Record details
Page 183, ENE 02 PREDICTION OF OPERATIONAL ENERGY AND CARBON BREEAM NEW CONSTRUCTION. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid b60a2de454204bf9 · document e3e19e8b697bf44b · fidelity verbatim · published 2024