The document this clause was read from is superseded. It is kept so older citations resolve.

EPD Validity and Update Requirements

International EPD System·clause 2.2.4·p.10

The requirement

The publisher’s words are shown on request, below the limits.

The publisher’s words

The publisher lets each reader see 3 of this document’s clauses a day.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Who checks it
Applicant declares — a signed statement from the applicant

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential
Impact area
Climate Health — the CMF area the clause addresses
Also bears on
Human Health, Circular Economy, Ecosystem Health — other CMF areas the clause addresses

Cite this clause

International EPD System · PCR 2019:14 Construction products · version v1.11 · clause 2.2.4 · page 10 · build 2026-10-05-0439 · https://klarcite.com/r/b0c0f6c5e21380c4

Source document

Record details

Page 10, PRODUCT CATEGORY RULES (PCR). Read in build 2026-10-05-0439, harvested 2026-10-05.

uid b0c0f6c5e21380c4 · document 5d4011cc26df7504 · fidelity verbatim · published 2021-02-05

Other clauses in this standard