The document this clause was read from is superseded. It is kept so older citations resolve.
Water saving measures implemented and monitored
BREEAM·clause A1-3d·p.421; 422
The requirement
BREEAM International New Construction Technical Manual clause A1-3d — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- View procedures on site. If there is a site-specific environmental policy which indicates how water saving measures are managed and monitored on site, this point can be awarded.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Screen — a check against a list or a criterion before anything else applies
- Standing
- Required — must be met for the credential
- Impact area
- Ecosystem Health — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v6.0 · clause A1-3d · page 421; 422 · build 2026-10-05-0439 · https://klarcite.com/r/ac913289160b9119
Record details
Page 421; 422 of the file (printed page 421), Checklist A1-3 - Environmentally aware requirements. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid ac913289160b9119 · document c79f01533227ee10 · published 2016