External lighting
BREEAM·clause Ene 03·p.175
The requirement
BREEAM International New Construction Technical Manual clause Ene 03 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- The relevant section or clauses of the BREEAM Assessor's site inspection report and photographic evidence or as-built drawings. Manufacturers’ product details.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
- Impact area
- Climate Health — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v6.0 · clause Ene 03 · page 175 · build 2026-10-05-0439 · https://klarcite.com/r/abd9ac8e8bb8f15e
Record details
Page 175, BREEAM International New Construction. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid abd9ac8e8bb8f15e · document c79f01533227ee10 · fidelity close quote · published 2016