Technical specifications of PVs and plan drawings

BREEAM·clause ENE-04·p.202

The requirement

BREEAM International New Construction Technical Manual clause ENE-04 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Evidence required
Technical specifications, plan drawings, calculations, assessor site inspection report and photographic evidence.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Meet — a limit, condition or outcome the product must satisfy
Standing
Required — must be met for the credential
Impact area
Climate Health — the CMF area the clause addresses

Cite this clause

BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause ENE-04 · page 202 · build 2026-10-05-0439 · https://klarcite.com/r/a882244a47dd9613

Source document

Record details

Page 202, ENE 04 LOW CARBON DESIGN BREEAM NEW CONSTRUCTION. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid a882244a47dd9613 · document e3e19e8b697bf44b · fidelity close quote · published 2024