Technical specifications of PVs and plan drawings
BREEAM·clause ENE-04·p.202
The requirement
BREEAM International New Construction Technical Manual clause ENE-04 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- Technical specifications, plan drawings, calculations, assessor site inspection report and photographic evidence.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Climate Health — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause ENE-04 · page 202 · build 2026-10-05-0439 · https://klarcite.com/r/a882244a47dd9613
Record details
Page 202, ENE 04 LOW CARBON DESIGN BREEAM NEW CONSTRUCTION. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid a882244a47dd9613 · document e3e19e8b697bf44b · fidelity close quote · published 2024