Sensors must be NDIR type and installed according to manufacturer's recommendations
BREEAM·clause M1.3·p.122
The requirement
BREEAM International New Construction Technical Manual clause M1.3 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Human Health — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause M1.3 · page 122 · build 2026-10-05-0439 · https://klarcite.com/r/a1afa14c33c0fc1f
Record details
Page 122, HEA 04 INDOOR AIR QUALITY BREEAM NEW CONSTRUCTION. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid a1afa14c33c0fc1f · document e3e19e8b697bf44b · fidelity verbatim · published 2024