High and low risk areas of the site
BREEAM·clause Prerequisite 20-22·p.411
The requirement
BREEAM International New Construction Technical Manual clause Prerequisite 20-22 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and located; only its shape defeated the harvest.
How it is proven
- Evidence required
- 1. High and low risk areas of the site.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
- Impact area
- Ecosystem Health — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause Prerequisite 20-22 · page 411 · build 2026-10-05-0439 · https://klarcite.com/r/9f83e5af164dacf3
Record details
Page 411, POL 03 FLOOD AND SURFACE WATER MANAGEMENT. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 9f83e5af164dacf3 · document e3e19e8b697bf44b · fidelity verbatim · published 2024