Demonstrate waste diversion and salvage achievement for demolition projects

GECA·clause EV-6.3·p.34

The requirement

The publisher’s words are shown on request, below the limits.

The publisher’s words

The publisher lets each reader see 3 of this document’s clauses a day.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
DoC EV-6.3.1: evidence that the demolition rate was met for all projects completed under the license. DoC EV-6.3.2: the final measurements and record of all demolition waste generated by the licensed service, including: the waste material salvaged, the waste sent to landfill, and the corresponding actual diversion rates. DoC EV-6.3.3: evidence showing that all concrete waste generated was reused.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Disclose — information the applicant must provide
Standing
Required — must be met for the credential
Impact area
Circular Economy — the CMF area the clause addresses

Cite this clause

GECA · Construction & Demolition Waste Services · version CDWS Gen 3.0 · clause EV-6.3 · page 34 · build 2026-10-05-0439 · https://klarcite.com/r/9f06e052b3db5c96

Source document

Record details

Page 34, EV-6.3 DEMONSTRATED WASTE DIVERSION. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 9f06e052b3db5c96 · document 64328b61121907c8 · fidelity verbatim · published 2026-06

Other clauses in this standard