The document this clause was read from is superseded. It is kept so older citations resolve.

Internal storage area requirements

BREEAM·clause CN3.4 Internal storage areas and manoeuvring space·p.319

The requirement

BREEAM International New Construction Technical Manual clause CN3.4 Internal storage areas and manoeuvring space — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

What the product must meet

Applies to
non-residential buildings and residential institutions

How it is proven

Evidence required
Design drawings or relevant section or clauses of the building specification confirming provision and scope of dedicated facilities (on site and off-site). Project team meeting minutes or a letter confirming likely building waste streams and indicative volumes. BREEAM Assessor's site inspection report and photographic evidence.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Disclose — information the applicant must provide
Standing
Required — must be met for the credential
Impact area
Circular Economy — the CMF area the clause addresses

Cite this clause

BREEAM · BREEAM International New Construction Technical Manual · version v6.0 · clause CN3.4 Internal storage areas and manoeuvring space · page 319 · build 2026-10-05-0439 · https://klarcite.com/r/9e71aea4168508b7

Source document

Record details

Page 319, Wst 03a Operational waste. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 9e71aea4168508b7 · document c79f01533227ee10 · fidelity close quote · published 2016