Thermal comfort strategy for less complex heating or cooling systems
BREEAM·clause HEA 05 M2.3·p.134
The requirement
BREEAM International New Construction Technical Manual clause HEA 05 M2.3 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause HEA 05 M2.3 · page 134 · build 2026-10-05-0439 · https://klarcite.com/r/9c03b0b0aa784095
Record details
Page 134, HEA 05 THERMAL COMFORT BREEAM NEW CONSTRUCTION. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 9c03b0b0aa784095 · document e3e19e8b697bf44b · fidelity verbatim · published 2024