EDC Production Process

BEP PVC·clause 3.2 EDC·p.8

The requirement

The publisher’s words are shown on request, below the limits.

The publisher’s words

The publisher lets each reader see 3 of this document’s clauses a day.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
Appendix D in AS/NZS 5395 if EDC supply is from a fully integrated plant; declaration from the EDC manufacturer(s) as per Appendix C for non-fully integrated plants.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Meet — a limit, condition or outcome the product must satisfy
Standing
Required — must be met for the credential
Impact area
Ecosystem Health — the CMF area the clause addresses

Cite this clause

BEP PVC · POP106 Verification Guidance for Best Environmental Practice PVC Pipe and Fittings · version Issue 2.0 · clause 3.2 EDC · page 8 · build 2026-10-05-0439 · https://klarcite.com/r/9ad2e7295a3850c8

Source document

Record details

Page 8, EDC. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 9ad2e7295a3850c8 · document f1ab241146688aa8 · fidelity verbatim · published 2024-06

Other clauses in this standard