How it is proven
- Evidence required
- Appendix D in AS/NZS 5395 if chlorine supply is from a fully integrated plant; declaration from the chlorine manufacturer(s) as per Appendix B for non-fully integrated plants.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Ecosystem Health — the CMF area the clause addresses
Cite this clause
BEP PVC · POP106 Verification Guidance for Best Environmental Practice PVC Pipe and Fittings · version Issue 2.0 · clause 3.2 Chlorine · page 8 · build 2026-10-05-0439 · https://klarcite.com/r/5c24211bce93aeb3
Record details
Page 8, Chlorine. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 5c24211bce93aeb3 · document f1ab241146688aa8 · fidelity verbatim · published 2024-06
Other clauses in this standard
| Clause | Name |
|---|---|
| 1 | Conformity Assessment Body (CAB) registration and accreditation |
| 2 | Supplier's Declaration of Conformity |
| 3.1 | Supply Chain Mapping |
| 3.2 | BEP PVC Resin Certification or Declarations |
| 3.2 EDC | EDC Production Process |
| 3.2 Environmental Management System (EMS) | PVC Resin Production EMS Requirements |