Testing, measurement and calculation procedures - Residential buildings
BREEAM·clause M2·p.143
The requirement
BREEAM International New Construction Technical Manual clause M2 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
The document’s own listing
Units with separating walls only: 2 Units with separating walls and floors: 6
The document’s own compact listing of the limits, as harvested.
- Applies to
- Residential buildings and residential institutions (long term stay)
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Screen — a check against a list or a criterion before anything else applies
- Standing
- Required — must be met for the credential
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause M2 · page 143 · build 2026-10-05-0439 · https://klarcite.com/r/8e2c1c1cbb969403
Record details
Page 143, HEA 06 ACOUSTIC PERFORMANCE. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 8e2c1c1cbb969403 · document e3e19e8b697bf44b · fidelity verbatim · published 2024