The document this clause was read from is superseded. It is kept so older citations resolve.
Verification of emission reporting
Concrete Sustainability Council·clause E4.03·p.80
The requirement
CSC Technical Manual clause E4.03 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- Copy of the verification statement. OR If the plant is subject to a system of emissions monitoring (see the annex).
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
- Impact area
- Ecosystem Health — the CMF area the clause addresses
Cite this clause
Concrete Sustainability Council · CSC Technical Manual · version v2.1 · clause E4.03 · page 80 · build 2026-10-05-0439 · https://klarcite.com/r/87a72e3eb20d3622
Record details
Page 80, E4 - Air Quality. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 87a72e3eb20d3622 · document 1a9857eb57c8253e · fidelity verbatim · published 2021-11-22
Other clauses in this standard
| Clause | Name |
|---|---|
| 1.7 | Use of CSC Logo |
| 1.8 | Certificate Validity and Withdrawal |
| 1.9 | Grievance Procedure |
| 3.4 | Traceability Framework |
| B1.01 | Local Economy |
| B2.01 | Ethical risk assessment |