Procurement program for raw materials

GECA·clause EV-5.6.1·p.35

The requirement

The publisher’s words are shown on request, below the limits.

The publisher’s words

The publisher lets each reader see 4 of this document’s clauses a day.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
Records of the supplier, nature and geographical source of all non-recycled sand and rock. Evidence of a registered environmental remediation program. Description of the raw material procurement program, and management systems in place to ensure that virgin raw materials do not come from environments that are protected for biological and/or social reasons.
Who checks it
Applicant declares — a signed statement from the applicant

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential
Impact area
Ecosystem Health — the CMF area the clause addresses
Also bears on
Social Health & Equity — other CMF areas the clause addresses

Cite this clause

GECA · Building Insulation Materials · version BIM Gen 3.0 · clause EV-5.6.1 · page 35 · build 2026-10-05-0439 · https://klarcite.com/r/873fdfa509e44f84

Source document

Record details

Page 35, EV-5.6.1: PROTECTION OF ECOLOGICALLY AND SOCIALLY SENSITIVE AREAS. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 873fdfa509e44f84 · document 6a818ca4f3f10cf8 · fidelity verbatim · published 2026-06

Other clauses in this standard