Scope Schedule
GECA·clause GN-1.1·p.18
The requirement
The publisher’s words are shown on request, below the limits.
What the product must meet
- Exemptions
- This standard excludes reflective foil-type insulants and those used for specialist applications, such as pipe and hot water cylinder lagging.
The publisher’s words
The publisher lets each reader see 4 of this document’s clauses a day.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
How it is proven
- Evidence required
- DoC GN-1.1.1: Detailed description of the product(s) or product range; and DoC GN-1.1.2: Explanation of applicability of the product(s) to the scope of this standard.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
Cite this clause
GECA · Building Insulation Materials · version BIM Gen 3.0 · clause GN-1.1 · page 18 · build 2026-10-05-0439 · https://klarcite.com/r/8222a9fa16f1722c
Record details
Page 18, GN-1.1 SCOPE SCHEDULE. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 8222a9fa16f1722c · document 6a818ca4f3f10cf8 · fidelity verbatim · published 2026-06
Other clauses in this standard
| Clause | Name |
|---|---|
| EV-1.1 | Compliance with environmental legislation |
| EV-3.1.1 | Minimum recycled content requirements |
| EV-3.1.2 | Environmental remediation program for sand and rock |
| EV-3.1.2.3 | Raw material procurement program |
| EV-3.1.3 | No bleaching of cellulose fibre |
| EV-3.1.4 | Scoured wool requirements |