Scope Schedule

GECA·clause GN-1.1·p.18

The requirement

The publisher’s words are shown on request, below the limits.

What the product must meet

Exemptions
This standard excludes reflective foil-type insulants and those used for specialist applications, such as pipe and hot water cylinder lagging.

The publisher’s words

The publisher lets each reader see 4 of this document’s clauses a day.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
DoC GN-1.1.1: Detailed description of the product(s) or product range; and DoC GN-1.1.2: Explanation of applicability of the product(s) to the scope of this standard.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Disclose — information the applicant must provide
Standing
Required — must be met for the credential

Cite this clause

GECA · Building Insulation Materials · version BIM Gen 3.0 · clause GN-1.1 · page 18 · build 2026-10-05-0439 · https://klarcite.com/r/8222a9fa16f1722c

Source document

Record details

Page 18, GN-1.1 SCOPE SCHEDULE. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 8222a9fa16f1722c · document 6a818ca4f3f10cf8 · fidelity verbatim · published 2026-06

Other clauses in this standard