Sustainable Transport Measures
BREEAM·clause TRA 02A·p.240; 258
The requirement
BREEAM International New Construction Technical Manual clause TRA 02A — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- Electric vehicle charging infrastructure setup, car sharing group or facility promotion, priority spaces for car sharers, engagement with local authority to review public cycle and pedestrian routes, installation of minimum number of cycle storage spaces as set out in Table 57.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Climate Health — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause TRA 02A · page 240; 258 · build 2026-10-05-0439 · https://klarcite.com/r/8162398b69b4fee8
Record details
Page 240; 258, TRA 02A SUSTAINABLE TRANSPORT MEASURES BREEAM NEW CONSTRUCTION. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 8162398b69b4fee8 · document e3e19e8b697bf44b · fidelity condensed · published 2024