Installed controls

BREEAM·clause ENE 08·p.225

The requirement

BREEAM International New Construction Technical Manual clause ENE 08 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

What the product must meet

Applies to
(all buildings)
Exemptions
This issue is filtered out for buildings which have no space heating, no space cooling and no mechanical ventilation.

How it is proven

Evidence required
Relevant section or clauses of the building specification, contract. Final construction drawings or equivalent, assessor site inspection report and photographic evidence showing installed HVAC systems and control functionality.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Meet — a limit, condition or outcome the product must satisfy
Standing
Required — must be met for the credential
Impact area
Climate Health — the CMF area the clause addresses

Cite this clause

BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause ENE 08 · page 225 · build 2026-10-05-0439 · https://klarcite.com/r/8009bab9f630ae0a

Source document

Record details

Page 225, ENE 08 INSTALLED CONTROLS. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 8009bab9f630ae0a · document e3e19e8b697bf44b · fidelity verbatim · published 2024