The document this clause was read from is superseded. It is kept so older citations resolve.
Corrective actions based upon incidents
Concrete Sustainability Council·clause S3.10·p.119
The requirement
CSC Technical Manual clause S3.10 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- Documentation of the analysis and corrective actions, where applicable, taken after an incident
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Social Health & Equity — the CMF area the clause addresses
Cite this clause
Concrete Sustainability Council · CSC Technical Manual · version v2.1 · clause S3.10 · page 119 · build 2026-10-05-0439 · https://klarcite.com/r/719b2e58f375e895
Record details
Page 119. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 719b2e58f375e895 · document 1a9857eb57c8253e · fidelity verbatim · published 2021-11-22
Other clauses in this standard
| Clause | Name |
|---|---|
| 1.7 | Use of CSC Logo |
| 1.8 | Certificate Validity and Withdrawal |
| 1.9 | Grievance Procedure |
| 3.4 | Traceability Framework |
| B1.01 | Local Economy |
| B2.01 | Ethical risk assessment |