Sampling location strategy for post-construction indoor air quality measurement

BREEAM·clause M3.3·p.124

The requirement

BREEAM International New Construction Technical Manual clause M3.3 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Screen — a check against a list or a criterion before anything else applies
Standing
Required — must be met for the credential
Impact area
Human Health — the CMF area the clause addresses

Cite this clause

BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause M3.3 · page 124 · build 2026-10-05-0439 · https://klarcite.com/r/70efbc2ffd09b67d

Source document

Record details

Page 124, HEA 04 INDOOR AIR QUALITY BREEAM NEW CONSTRUCTION. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 70efbc2ffd09b67d · document e3e19e8b697bf44b · fidelity verbatim · published 2024