Testing, measurement and calculation procedures - Non-residential buildings

BREEAM·clause M1·p.142

The requirement

BREEAM International New Construction Technical Manual clause M1 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

What the product must meet

Applies to
All building types except residential and residential institutions (long term stay)

How it is proven

Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Screen — a check against a list or a criterion before anything else applies
Standing
Required — must be met for the credential

Cite this clause

BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause M1 · page 142 · build 2026-10-05-0439 · https://klarcite.com/r/66a012f1dc0ca9de

Source document

Record details

Page 142, HEA 06 ACOUSTIC PERFORMANCE. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 66a012f1dc0ca9de · document e3e19e8b697bf44b · fidelity verbatim · published 2024