Testing, measurement and calculation procedures - Non-residential buildings
BREEAM·clause M1·p.142
The requirement
BREEAM International New Construction Technical Manual clause M1 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
- Applies to
- All building types except residential and residential institutions (long term stay)
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Screen — a check against a list or a criterion before anything else applies
- Standing
- Required — must be met for the credential
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause M1 · page 142 · build 2026-10-05-0439 · https://klarcite.com/r/66a012f1dc0ca9de
Record details
Page 142, HEA 06 ACOUSTIC PERFORMANCE. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 66a012f1dc0ca9de · document e3e19e8b697bf44b · fidelity verbatim · published 2024