The document this clause was read from is superseded. It is kept so older citations resolve.
Sub-metering by end-use
BREEAM·clause Ene 02a Sub-metering by end-use (1 credit)·p.165
The requirement
BREEAM International New Construction Technical Manual clause Ene 02a Sub-metering by end-use (1 credit) — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
Limits held for this clause
| Parameter / context | Operator | Limit | Unit |
|---|---|---|---|
| share | ≥ | 90 | % |
Compare this limit across schemes
The limit was read from the clause wording.
- Applies to
- non-residential, plus residential institutions
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Climate Health — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v6.0 · clause Ene 02a Sub-metering by end-use (1 credit) · page 165 · build 2026-10-05-0439 · https://klarcite.com/r/63c2aa663f88fc05
Record details
Page 165, Ene 02a Energy monitoring. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 63c2aa663f88fc05 · document c79f01533227ee10 · fidelity verbatim · published 2016