Sub-metering by end-use

BREEAM·clause Ene 02a Sub-metering by end-use (1 credit)·p.165

The requirement

BREEAM International New Construction Technical Manual clause Ene 02a Sub-metering by end-use (1 credit) — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

What the product must meet

Limits held for this clause

Parameter / contextOperatorLimitUnit
share≥90%

Compare this limit across schemes

The limit was read from the clause wording.

Applies to
non-residential, plus residential institutions

How it is proven

Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Meet — a limit, condition or outcome the product must satisfy
Standing
Required — must be met for the credential
Impact area
Climate Health — the CMF area the clause addresses

Cite this clause

BREEAM · BREEAM International New Construction Technical Manual · version v6.0 · clause Ene 02a Sub-metering by end-use (1 credit) · page 165 · build 2026-10-05-0439 · https://klarcite.com/r/63c2aa663f88fc05

Source document

Record details

Page 165, Ene 02a Energy monitoring. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 63c2aa663f88fc05 · document c79f01533227ee10 · fidelity verbatim · published 2016