The requirement
The publisher’s words are shown on request, below the limits.
What the product must meet
- Exemptions
- If there is no dedicated transmission line or if contractual instruments have been sold to a third party, the electricity shall be modelled as it was from the grid. If data cannot be obtained from the supplier, proxy data representing the same power source may be used.
The publisher’s words
The publisher lets each reader see 15 of this document’s clauses a day when signed in, or 5 without signing in.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
- Impact area
- Climate Health — the CMF area the clause addresses
Cite this clause
International EPD System · PCR 2019:14 Construction products · version v2.0.1 · clause 4.7.2.2 · page 33 · build 2026-10-05-0439 · https://klarcite.com/r/5ca594d7a11e4d7d