Green roofs for minimising watercourse pollution

BREEAM·clause CN3.16·p.385

The requirement

BREEAM International New Construction Technical Manual clause CN3.16 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Evidence required
Evidence is still required to demonstrate that the 5mm rainfall from all other hard surfaces on site is being dealt with, to allow this credit to be awarded.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Meet — a limit, condition or outcome the product must satisfy
Standing
Required — must be met for the credential
Impact area
Ecosystem Health — the CMF area the clause addresses

Cite this clause

BREEAM · BREEAM International New Construction Technical Manual · version v6.0 · clause CN3.16 · page 385 · build 2026-10-05-0439 · https://klarcite.com/r/5c415a67188b564a

Source document

Record details

Page 385, Pollution. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 5c415a67188b564a · document c79f01533227ee10 · fidelity close quote · published 2016