Education buildings - occupant controls

BREEAM·clause CN4.1·p.117

The requirement

BREEAM International New Construction Technical Manual clause CN4.1 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Evidence required
Criteria Interim design stage Final post-construction stage 1–4 The relevant section or clauses of the Thermal modelling, measurement and building specification, or contract or evaluation results reflecting any changes correspondence (e.g. letter, email or to the design and resultant PMV/PPD data meeting minutes) from the design team. with confirmation that these are within Thermal modelling, measurements and the required limits. evaluation results with confirmation that these are within the required limits. PMV/PPD data from the design team. TechnicalManual–Version6.0.0–01/12/2021–SD250 117
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Disclose — information the applicant must provide
Standing
Required — must be met for the credential

Cite this clause

BREEAM · BREEAM International New Construction Technical Manual · version v6.0 · clause CN4.1 · page 117 · build 2026-10-05-0439 · https://klarcite.com/r/5983f985d5d85242

Source document

Record details

Page 117, Health and wellbeing. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 5983f985d5d85242 · document c79f01533227ee10 · fidelity verbatim · published 2016