Designing to prevent water damage

BREEAM·clause M5·p.317

The requirement

BREEAM International New Construction Technical Manual clause M5 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Evidence required
Design drawings illustrating vulnerable areas or parts of the building. Assessor's site inspection, and photographic evidence confirming compliance. OR Design drawings or specification confirming the measures to prevent water damage, ingress and ponding.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Screen — a check against a list or a criterion before anything else applies
Standing
Required — must be met for the credential
Impact area
Human Health — the CMF area the clause addresses

Cite this clause

BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause M5 · page 317 · build 2026-10-05-0439 · https://klarcite.com/r/5913a69f42ffd6c5

Source document

Record details

Page 317, M5: Designing to prevent water damage. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 5913a69f42ffd6c5 · document e3e19e8b697bf44b · fidelity close quote · published 2024