Glazing to Floor Area Ratio
BREEAM·clause HEA 01 M1.2·p.93
The requirement
BREEAM International New Construction Technical Manual clause HEA 01 M1.2 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
Limits held for this clause
| Parameter / context | Operator | Limit | Unit |
|---|---|---|---|
| share | > | 7 | % |
Compare this limit across schemes
The limit was read from the clause wording.
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause HEA 01 M1.2 · page 93 · build 2026-10-05-0439 · https://klarcite.com/r/52d78c40bb3777eb
Record details
Page 93, HEA 01 NATURAL LIGHT BREEAM NEW CONSTRUCTION. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 52d78c40bb3777eb · document e3e19e8b697bf44b · fidelity condensed · published 2024