Highways and impermeable areas

BREEAM·clause CN3.4·p.408

The requirement

BREEAM International New Construction Technical Manual clause CN3.4 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

What the product must meet

Exemptions
Where buildings are built beside existing highways or where adoptable highways are built, the impermeable area of the highway does not need to be included in calculations.

How it is proven

Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Meet — a limit, condition or outcome the product must satisfy
Standing
Required — must be met for the credential
Impact area
Ecosystem Health — the CMF area the clause addresses

Cite this clause

BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause CN3.4 · page 408 · build 2026-10-05-0439 · https://klarcite.com/r/4f66d81ce4544474

Source document

Record details

Page 408. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 4f66d81ce4544474 · document e3e19e8b697bf44b · fidelity close quote · published 2024