Fabric performance optimisation
BREEAM·clause Up to two credits - Fabric performance optimisation·p.197
The requirement
BREEAM International New Construction Technical Manual clause Up to two credits - Fabric performance optimisation — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Guidance — explains or advises; not assessed
- Impact area
- Climate Health — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause Up to two credits - Fabric performance optimisation · page 197 · build 2026-10-05-0439 · https://klarcite.com/r/4744cd71659d55f7
Record details
Page 197, BREEAM NEW CONSTRUCTION ENE 04 LOW CARBON DESIGN. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 4744cd71659d55f7 · document e3e19e8b697bf44b · fidelity close quote · published 2024