Provision of Compostable Waste Facilities
BREEAM·clause WST 03A·p.335
The requirement
BREEAM International New Construction Technical Manual clause WST 03A — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- Design drawings or relevant section of the building specification or contract clauses to confirm the provision of compliant organic waste storage where relevant.
- Who checks it
- Applicant declares — a signed statement from the applicant
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Circular Economy — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause WST 03A · page 335 · build 2026-10-05-0439 · https://klarcite.com/r/439d70edbd358452
Record details
Page 335, WST 03A OPERATIONAL WASTE BREEAM NEW CONSTRUCTION. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 439d70edbd358452 · document e3e19e8b697bf44b · fidelity close quote · published 2024