Drainage design measures (local failure)

BREEAM·clause Pol 03 - Surface water run-off·p.379

The requirement

BREEAM International New Construction Technical Manual clause Pol 03 - Surface water run-off — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

What the product must meet

Applies to
(all buildings)

How it is proven

Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Meet — a limit, condition or outcome the product must satisfy
Standing
Required — must be met for the credential
Impact area
Ecosystem Health — the CMF area the clause addresses

Cite this clause

BREEAM · BREEAM International New Construction Technical Manual · version v6.0 · clause Pol 03 - Surface water run-off · page 379 · build 2026-10-05-0439 · https://klarcite.com/r/42a7ca812768df74

Source document

Record details

Page 379, Pollution BREEAM International New Construction. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 42a7ca812768df74 · document c79f01533227ee10 · fidelity close quote · published 2016