Drainage design measures (local failure)
BREEAM·clause Pol 03 - Surface water run-off·p.379
The requirement
BREEAM International New Construction Technical Manual clause Pol 03 - Surface water run-off — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
- Applies to
- (all buildings)
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Ecosystem Health — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v6.0 · clause Pol 03 - Surface water run-off · page 379 · build 2026-10-05-0439 · https://klarcite.com/r/42a7ca812768df74
Record details
Page 379, Pollution BREEAM International New Construction. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 42a7ca812768df74 · document c79f01533227ee10 · fidelity close quote · published 2016