Non-residential buildings - Calculating EPR with multiple energy modelling outputs

BREEAM·clause M1.2·p.170

The requirement

BREEAM International New Construction Technical Manual clause M1.2 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

What the product must meet

Applies to
(non-residential buildings)
Exemptions
This does not apply where the ‘similar buildings’ approach is used.

How it is proven

Evidence required
area-weighted calculations and modelling outputs must be provided as supporting evidence.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Meet — a limit, condition or outcome the product must satisfy
Standing
Required — must be met for the credential
Impact area
Climate Health — the CMF area the clause addresses

Cite this clause

BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause M1.2 · page 170 · build 2026-10-05-0439 · https://klarcite.com/r/427e8959930c9df2

Source document

Record details

Page 170, M1.2: Non-residential buildings - Calculating EPR with multiple energy modelling. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 427e8959930c9df2 · document e3e19e8b697bf44b · fidelity verbatim · published 2024