The document this clause was read from is superseded. It is kept so older citations resolve.
Industrial unit with no office space
BREEAM·clause CN4·p.117
The requirement
BREEAM International New Construction Technical Manual clause CN4 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- Criteria Interim design stage Final post-construction stage 1–4 The relevant section or clauses of the Thermal modelling, measurement and building specification, or contract or evaluation results reflecting any changes correspondence (e.g. letter, email or to the design and resultant PMV/PPD data meeting minutes) from the design team. with confirmation that these are within Thermal modelling, measurements and the required limits. evaluation results with confirmation that these are within the required limits. PMV/PPD data from the design team. TechnicalManual–Version6.0.0–01/12/2021–SD250 117
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v6.0 · clause CN4 · page 117 · build 2026-10-05-0439 · https://klarcite.com/r/419f817ebcdd93ab
Record details
Page 117, Health and wellbeing. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 419f817ebcdd93ab · document c79f01533227ee10 · fidelity close quote · published 2016