Functional adaptation implementation details

BREEAM·clause CN3.1·p.336

The requirement

BREEAM International New Construction Technical Manual clause CN3.1 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Evidence required
Criteria Interim design stage Final post-construction stage All Functional adaptation strategy and As per interim design stage. implementation plan report.
Who checks it
Applicant declares — a signed statement from the applicant

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential
Impact area
Circular Economy — the CMF area the clause addresses

Cite this clause

BREEAM · BREEAM International New Construction Technical Manual · version v6.0 · clause CN3.1 · page 336 · build 2026-10-05-0439 · https://klarcite.com/r/3c7f2a0b68343505

Source document

Record details

Page 336, General. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 3c7f2a0b68343505 · document c79f01533227ee10 · fidelity close quote · published 2016