The document this clause was read from is superseded. It is kept so older citations resolve.
Functional adaptation implementation details
BREEAM·clause CN3.1·p.336
The requirement
BREEAM International New Construction Technical Manual clause CN3.1 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- Criteria Interim design stage Final post-construction stage All Functional adaptation strategy and As per interim design stage. implementation plan report.
- Who checks it
- Applicant declares — a signed statement from the applicant
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Circular Economy — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v6.0 · clause CN3.1 · page 336 · build 2026-10-05-0439 · https://klarcite.com/r/3c7f2a0b68343505
Record details
Page 336, General. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 3c7f2a0b68343505 · document c79f01533227ee10 · fidelity close quote · published 2016