Electric Vehicle Charging Infrastructure
BREEAM·clause TRA 02B EV Charging Infrastructure·p.266
The requirement
BREEAM International New Construction Technical Manual clause TRA 02B EV Charging Infrastructure — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Climate Health — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause TRA 02B EV Charging Infrastructure · page 266 · build 2026-10-05-0439 · https://klarcite.com/r/39c8ac015e982e00
Record details
Page 266, TRA 02B SUSTAINABLE TRANSPORT MEASURES. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 39c8ac015e982e00 · document e3e19e8b697bf44b · fidelity verbatim · published 2024