Water Efficient Equipment and Systems
BREEAM·clause WAT 04·p.284
The requirement
BREEAM International New Construction Technical Manual clause WAT 04 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- Calculations and justification relating to the identification of significant water demands. The relevant sections or clauses of the building specification or contract. Design drawings or metering schematics.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Ecosystem Health — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause WAT 04 · page 284 · build 2026-10-05-0439 · https://klarcite.com/r/3704c06f33259218
Record details
Page 284, WAT 04 WATER EFFICIENT EQUIPMENT AND SYSTEMS BREEAM NEW CONSTRUCTION. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 3704c06f33259218 · document e3e19e8b697bf44b · fidelity verbatim · published 2024