The document this clause was read from is superseded. It is kept so older citations resolve.
Electricity from the grid
International EPD System·clause 4.7.2.3·p.33
The requirement
The publisher’s words are shown on request, below the limits.
The publisher’s words
The publisher lets each reader see 9 of this document’s clauses a day when signed in, or 5 without signing in.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
How it is proven
- Evidence required
- documentation on the purchase and cancellation of the contractual instruments shall be provided to the verifier.
- Who checks it
- Applicant declares — a signed statement from the applicant
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
- Impact area
- Climate Health — the CMF area the clause addresses
Cite this clause
International EPD System · PCR 2019:14 Construction products · version v2.0.0 · clause 4.7.2.3 · page 33 · build 2026-10-05-0439 · https://klarcite.com/r/2c706c67937f5bb2
Record details
Page 33, ELECTRICITY MODELLING. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 2c706c67937f5bb2 · document ff8090cf8202223e · fidelity verbatim · published 2025-04-07