Evidence for residential buildings and institutions
BREEAM·clause CN4.6·p.130
The requirement
BREEAM International New Construction Technical Manual clause CN4.6 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
- Applies to
- All (residential buildings and residential institutions)
How it is proven
- Evidence required
- Additional information: Copies of the sound insulation field test results or a letter of confirmation that the required sound insulation performance standards as detailed in the assessment criteria have been achieved AND Evidence that the tests have been carried out by a compliant test body.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v6.0 · clause CN4.6 · page 130 · build 2026-10-05-0439 · https://klarcite.com/r/2ba29449ff8bb3e3
Record details
Page 130. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 2ba29449ff8bb3e3 · document c79f01533227ee10 · fidelity close quote · published 2016